Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Major maintenance of engines
   4.2. General information
   4.3. Compression check
   4.4. Recommendations about engine removal
   + 4.5. Removal and engine installation
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control люфта balance weight assemblies (engine 5S-FE)
   4.17. Engine balance of assembly at major maintenance
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Engine start after major maintenance
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



4.17. Engine balance of assembly at major maintenance

GENERAL INFORMATION

Assembly of the four-cylinder engine should be executed in the following order:

– piston rings;
– cranked shaft and radical bearings;
– pistons and rods;
– back sealing ring of a cranked shaft;
– balance weight assembly;
– head of the block of cylinders and pushers;
– camshafts;
– gear belt and pulleys;
– casings of a gear belt;
– oil pump;
– oil pallet;
– inlet and final collectors;
– cover of a head of the block of cylinders;
– drive flywheel/plate;
– hinged knots.

Assembly of the six-cylinder engine should be executed in the following order:

– piston rings;
– cranked shaft and radical bearings;
– pistons and rods;
– back cover of a cranked shaft;
– oil pump;
– oil pallet;
– heads of the block of cylinders;
– camshafts and pushers;
– gear belt and pulleys;
– casings of a gear belt;
– cover of a head of the block of cylinders;
– inlet and final collectors;
– drive flywheel/plate;
– hinged knots.