Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Major maintenance of engines
   4.2. General information
   4.3. Compression check
   4.4. Recommendations about engine removal
   + 4.5. Removal and engine installation
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control люфта balance weight assemblies (engine 5S-FE)
   4.17. Engine balance of assembly at major maintenance
   4.18. Installation of piston rings
   - 4.19. Installation of a cranked shaft and check of working gaps of bearings
      4.19.1. Check of a working gap of the bearing
      4.19.2. Final installation of a cranked shaft
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Engine start after major maintenance
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



4.19.1. Check of a working gap of the bearing

GENERAL INFORMATION

Sequence of a tightening of bolts of fastening of covers of radical bearings on четырехци the lindrovy engine

Sequence of a tightening of bolts of fastening of covers of radical bearings on the engine 3VZ-FE

Sequence of a tightening of bolts of fastening of covers of radical bearings on the engine 1MZ-FE

Sequence of a tightening of lateral bolts of fastening of covers of radical bearings on the engine 1MZ-FE

Screwing up of bolts of fastening of covers of radical bearings on the V6 engine

PERFORMANCE ORDER
1. Clear a back part of loose leaves and a place of their installation in the block of cylinders and covers of radical bearings.
2. Establish loose leaves on the places in the block of cylinders of the engine.
3. One of methods, which assumes micrometer existence for measurement of diameter of openings (see item 4), consists in establishing covers of radical bearings together with loose leaves on the block of cylinders and to screw them the demanded moment. Measure internal diameter of each collected pair of loose leaves of bearings. Measure diameter of each radical neck of a cranked shaft. Subtract from the measured diameter of the bearing the corresponding diameter of a radical neck of a cranked shaft.
4. The second (and more exact) a method consists in using a product known as for Plastigage. It is round plastic a sovy core which is compressed between the loose leaf and a neck of a cranked shaft. After removal of a cover of the radical bearing the deformed plastic core is measured by a special template which is available in Plastigage set. Procedure for Plastigage use following.
4а. On established in the block of cylinders loose leaves establish without greasing a cranked shaft. Necks of a cranked shaft and loose leaves should be absolutely pure and dry.
4б. Cut off some slices of a plastic core of Plastigage (they should be slightly shorter, than width of the main bearings) and establish on each neck of a cranked shaft.
4в. Establish covers with the bottom loose leaves and tighten bolts of fastening the demanded moment. In the course of gap measurement by the Plastigage method do not rotate a cranked shaft (see fig. Sequence of a tightening of bolts of fastening of covers of radical bearings on четырехци the lindrovy engine, Sequence of a tightening of bolts of fastening of covers of radical bearings on the engine 3VZ-FE, Sequence of a tightening of bolts of fastening of covers of radical bearings on the engine 1MZ-FE, Sequence of a tightening of lateral bolts of fastening of covers of radical bearings on the engine 1MZ-FE).
4г. Unscrew a cover of fastening of the loose leaf, remove it and to the deformed plastic core put a large-scale ruler. Comparing width of the deformed plastic core with control width on a large-scale ruler, define gap size.
4д. In end carefully clear Plastigage-material traces from loose leaves and a cranked shaft.