Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
- 3. Six-cylinder V6 engines
   3.2. General information
   3.3. The repair which is not demanding removal of the engine
   + 3.4. Top dead point (VMT) of the piston of the first cylinder
   + 3.5. Cover of a head of the block of cylinders
   + 3.6. Inlet collector
   3.7. Final collector
   + 3.8. Gear belt and pulleys
   3.9. Replacement of a forward sealing ring of a cranked shaft
   3.10. Replacement of sealing rings of camshafts
   + 3.11. Camshafts and pushers
   + 3.12. Head of the block of cylinders
   + 3.13. Oil pallet
   + 3.14. Oil pump
   3.15. Drive flywheel / plate
   3.16. Replacement of a back sealing ring of a cranked shaft
   3.17. Suspension bracket of the power unit
+ 4. Major maintenance of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



3.7. Final collector

GENERAL INFORMATION

Prevention

Works on a final collector are necessary for making on the cold engine.

At existence in a code radio receiver against theft, before an accumulator detachment, check that you have connection codes.

On models since 1993 the system of an airbag of safety is disconnected, if the accumulator is disconnected for long term. If a control lamp of a safety cushion it lights up and necessary to burn after repeated connection of the accumulator, it is necessary to address in специали a zirovanny workshop for restoration of operability of system.


Removal of an EGR pipe from a back collector of the engine 1MZ-FE

PERFORMANCE ORDER

1. Remove a weight wire from the accumulator.

2. Spray oil on all connections of a final collector and allow to be absorbed to oil.

3. Remove oxygen sensors from a forward and back collector.
4. Remove an EGR pipe from a final collector.
5. On the engine 3VZ-FE remove thermofilters from an inlet collector.
6. Unscrew nuts of fastening of a final collector and remove it from a head of the block of cylinders.
7. Examine a final collector on existence of cracks.
8. Clear interfaced surfaces of a final collector and a head of the block of cylinders.
9. Establish new laying on racks of a head of the block of cylinders.
10. Establish a final collector on a head of the block of cylinders and fix nuts. A tightening of nuts make in some stages from the center to the periphery.
11. Further installation is made in sequence, return to removal.