Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
- 2. Engine
   2.2. Operations on engine repair on the car
   2.3. Top dead point of the first cylinder
   + 2.4. Cover of a head of the block of cylinders
   + 2.5. Inlet collector
   + 2.6. Final collector
   + 2.7. Gear belt and pulleys
   2.8. Replacement of a forward sealing ring of a cranked shaft
   2.9. Replacement of a sealing ring of a camshaft
   + 2.10. Camshaft and pushers
   - 2.11. Head of the block of cylinders
      2.11.2. Installation
   + 2.12. Oil pallet
   + 2.13. Oil pump
   + 2.14. Drive flywheel / plate
   2.15. Replacement of a back sealing ring of a cranked shaft
   + 2.16. Suspension bracket of the power unit
+ 3. Six-cylinder V6 engines
+ 4. Major maintenance of engines
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



2.11.2. Installation

PERFORMANCE ORDER

1. Interfaced surfaces of a head and the block of cylinders should be absolutely pure. For their cleaning use a firm plastic or wooden scraper. When cleaning be careful, as the aluminum alloy is very easy for damaging.

2. Check, that the deposit did not get to oil and water canals. It is especially important for greasing system as the deposit can block supply of oil to engine components. If necessary clear channels, check interfaced surfaces of a head and the block of cylinders on existence of notches, deep scratches and other damages. If defects small, they can be removed with machining, but at major defects of a detail are subject to replacement.

3. Clear openings under bolts in the block of cylinders. Zavinchiva bolt scientific research institute in the opening filled with oil can break off the block because of hydraulic pressure.
4. Using a metal ruler and щуп, check плоскост a nost of interfaced surfaces.
5. Establish new laying of a head of the block of cylinders on adjusting pins in the block of cylinders.
6. Establish a head on the block of cylinders of the engine.
7. Grease a carving of bolts of fastening of a head of the block of cylinders with a thin layer of engine oil.

8. Establish bolts of fastening of a head of the block of cylinders and tighten them the demanded moment in some stages in the sequence presented in drawing.
9. Further installation is made in sequence, return to removal.
10. Check and, if necessary, adjust gaps of valves.
11. Fill in cooling liquid in cooling system. Establish the new oil filter and add engine oil.