Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Major maintenance of engines
   4.2. General information
   4.3. Compression check
   4.4. Recommendations about engine removal
   + 4.5. Removal and engine installation
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control люфта balance weight assemblies (engine 5S-FE)
   4.17. Engine balance of assembly at major maintenance
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Engine start after major maintenance
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



4.16. Control люфта balance weight assemblies (engine 5S-FE)

GENERAL INFORMATION

Details of the balance weight of the engine 5S-FE

PERFORMANCE ORDER
1. Establish labels of a shaft of the balance weight No. 2 as is shown in drawing.
2. Then turn a balance weight shaft so that the label of D was combined with the index on a casing.
3. Using flat-nose pliers, fix a balance weight No. 2 shaft from a provorachivaniye.
4. Using the indicator of hour type, measure люфт on a balance weight No. 1 shaft.
5. Remove the indicator of hour type and turn a balance weight No. 2 shaft so that label Е was combined with the index. Establish the indicator of hour type and repeatedly measure люфт a balance weight No. 1 shaft.
6. Remove the indicator of hour type and turn a balance weight No. 2 shaft so that the label of D was combined with the index. Establish the indicator of hour type and repeatedly measure люфт a balance weight No. 1 shaft. If measured люфт in any case exceeds admissible limits, it is necessary to make repair of assembly of the balance weight at service station.