Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Major maintenance of engines
   4.2. General information
   4.3. Compression check
   4.4. Recommendations about engine removal
   + 4.5. Removal and engine installation
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   + 4.12. Block of cylinders of the engine
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control люфта balance weight assemblies (engine 5S-FE)
   4.17. Engine balance of assembly at major maintenance
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Engine start after major maintenance
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



4.18. Installation of piston rings

PERFORMANCE ORDER
1. Before installation of new piston rings check a gap in the lock of a piston ring. 2. Arrange pistons and piston rings according to cylinders in which they will work.
3. Establish the top sealing ring in the first cylinder and the bottom of the piston push it in the cylinder to the cylinder basis.
4. Using щуп, measure a gap in the ring lock.
5. Repeat measurement process with a ring established in the top part of the cylinder and compare results of measurement to technical requirements.
6. Repeat check operation for each ring in the first cylinder, then for rings in other cylinders.
7. Establish piston rings on pistons in the same way, as well as at removal.
8. First of all the maslosjemny ring which consists of three separate elements is established. Establish a dilator of a maslosjemny ring in a piston flute. 9. Then consistently establish the top and bottom maslosjemny rings.
10. Establish a kompressionny ring No. 2 so that the label at an end face of a ring was directed up. Do not mix the first and second kompressionny rings as they have a various profile.
11. After installation of piston rings on the piston check ease of moving of a piston ring in a piston flute.