Toyota Camry

1992-1997 of release

Repair and car operation



Kamri's Toyota
+ General data
+ 1. Maintenance
+ 2. Engine
+ 3. Six-cylinder V6 engines
- 4. Major maintenance of engines
   4.2. General information
   4.3. Compression check
   4.4. Recommendations about engine removal
   + 4.5. Removal and engine installation
   4.6. Sequence of dismantling of the engine
   4.7. Dismantling of a head of the block of cylinders
   + 4.8. Cleaning and survey of a head of the block of cylinders
   4.9. Assembly of a head of the block of cylinders
   4.10. Removal of pistons with rods
   4.11. Removal of a cranked shaft
   - 4.12. Block of cylinders of the engine
      4.12.2. Check
      4.12.3. Honingovaniye of cylinders
   4.13. Pistons and rods
   4.14. Cranked shaft
   + 4.15. Survey and choice of radical and shatunny bearings
   4.16. Control люфта balance weight assemblies (engine 5S-FE)
   4.17. Engine balance of assembly at major maintenance
   4.18. Installation of piston rings
   + 4.19. Installation of a cranked shaft and check of working gaps of bearings
   4.20. Installation of a back sealing ring of a cranked shaft
   4.21. Installation of pistons and rods, check of working gaps of bearings
   4.22. Installation of assembly of the balance weight (engine 5S-FE)
   4.23. Engine start after major maintenance
+ 5. Cooling and heating
+ 6. Fuel system
+ 7. Ignition system
+ 8. Toxicity fall
+ 9. Transmission
+ 10. Automatic transmission
+ 11. Coupling and power shafts
+ 12. Brake system
+ 13. Suspension bracket
+ 14. Body
+ 15. Electric equipment



4.12. Block of cylinders of the engine

4.12.1. Cleaning

PERFORMANCE ORDER
1. Remove all details and electric sensors from the block of cylinders. For complete cleaning remove technological caps. For removal of a technological cap, using a punch, turn a technological cap in a nest and...
2.... using flat-nose pliers, take it from the block of cylinders. 3. Also for removal of technological caps it is possible to drill a small opening in a cap and in an opening to screw in the self-cutting screw. Having pulled for a screw head, take a technological cap. On the engine 1MZ-FE technological caps fasten to the block of cylinders nuts.
4. Remove all traces of laying from interfaced surfaces of the block of cylinders of the engine.
5. Remove all caps of the oil highway. At installation use new caps.
6. The most polluted places clear the ferry.
7. Clear all lubricant openings and the oil highway. Wash out all internal channels a stream of warm water until water will not leave pure. It is necessary to drain completely the block of cylinders and to grease with a thin butter layer all interfaced surfaces for prevention of emergence of corrosion. Also grease engine cylinders. If there is a compressed air, use it to accelerate process of drying and to blow all lubricant openings and highways.
8. Carefully clear all carving openings, using a tap with the corresponding carving then blow openings the compressed air.
9. Establish jams to the oil highway in the block of cylinders of the engine and reliably them fix.
10. If the engine is not subject to immediate assembly, close the block of cylinders a big plastic bag to protect it from pollution.