|
Toyota Camry1992-1997 of releaseRepair and car operation |
|
Kamri's Toyota + General data + 1. Maintenance + 2. Engine + 3. Six-cylinder V6 engines - 4. Major maintenance of engines 4.2. General information 4.3. Compression check 4.4. Recommendations about engine removal - 4.5. Removal and engine installation 4.5.1. Removal 4.5.2. Installation 4.6. Sequence of dismantling of the engine 4.7. Dismantling of a head of the block of cylinders + 4.8. Cleaning and survey of a head of the block of cylinders 4.9. Assembly of a head of the block of cylinders 4.10. Removal of pistons with rods 4.11. Removal of a cranked shaft + 4.12. Block of cylinders of the engine 4.13. Pistons and rods 4.14. Cranked shaft + 4.15. Survey and choice of radical and shatunny bearings 4.16. Control люфта balance weight assemblies (engine 5S-FE) 4.17. Engine balance of assembly at major maintenance 4.18. Installation of piston rings + 4.19. Installation of a cranked shaft and check of working gaps of bearings 4.20. Installation of a back sealing ring of a cranked shaft 4.21. Installation of pistons and rods, check of working gaps of bearings 4.22. Installation of assembly of the balance weight (engine 5S-FE) 4.23. Engine start after major maintenance + 5. Cooling and heating + 6. Fuel system + 7. Ignition system + 8. Toxicity fall + 9. Transmission + 10. Automatic transmission + 11. Coupling and power shafts + 12. Brake system + 13. Suspension bracket + 14. Body + 15. Electric equipment |
4.5.2. Installation
Prevention
|
|